Advanced Technology Facilities
BIM, federated model management, confidential client
New York
DPS is engaged as to manage the federated model on a 1.2 million sq.ft. solar photovoltaic (PV) manufacturing facility.
About this project
DPS is engaged as to manage the federated model on a 1.2 million sq.ft. solar photovoltaic (PV) manufacturing facility. As the Federated Model Manager, DPS is responsible for facilitating the coordination between 9 contractors utilizing a single Navisworks® model. Contractor BIM (Building Information Modelling) models are submitted to DPS for approval. Once verified clash- free, constructible and design compliant by our team, the submittals then proceed to fabrication.
Process/support systems
- UPW generation and distribution
- Bulk chemicals and distribution
- Spec gases
- Bulk inert gases
- Waste water treatment
- Process exhaust
- Life safety
Facility features
The largest residential solar PV installer in the US has made a $5 billion capital project investment to establish a;
- 1.2 million sq.ft. “Gigafactory” manufacturing plant.
- 1.2 million sq.ft. ‘Clean Space’ Photovoltaic (PV) cells